Landlord EPC requirements in England and Wales
If you let a home in England or Wales and have its EPC in hand, work through five checks: whether the rules cover the letting, what to do about an F or G rating, exemptions, selling, and the planned 2030 standard.
By EPC Benchmark · Last reviewed
Sources checked . This is general information, not legal advice. EPC Benchmark has no exemption form or compliance checker.
1. Check whether the rules cover your letting
The minimum standard applies when the home both legally needs an EPC and is let on a tenancy within the domestic private rented sector rules. Under the current rule, since 1 April 2020, both new and ongoing covered lettings need at least band E or a valid registered exemption. See the GOV.UK landlord guidance on the minimum standard.
An F or G rating alone does not establish a breach: coverage and exemptions matter. If the property is vacant and you will not let it, the next step is different — check the rules before letting it again. If scope is unclear, take the tenancy agreement and EPC to your local authority or a qualified adviser.
2. Covered and rated F or G: works, funding and quotes
Check the certificate’s recommended works, any funding and installer quotes. The current self-funding cap is £3,500 including VAT. If cheaper work reaches E, you do not need to spend the rest. If E remains out of reach, complete the relevant improvements available within the cap, then check whether a specific exemption applies.
Fully funded third-party work to reach E is treated differently: the £3,500 cap does not limit that funding. For current schemes, see the energy grants guide.
3. Register an exemption before relying on it
An exemption only helps once it is registered. For the domestic high-cost route, even the cheapest recommended measure must exceed £3,500 including VAT, shown by three quotes from different qualified installers plus your confirmation. Measures you have already completed are recorded separately from those you could not afford within the cap.
Each reason has its own evidence and duration. An exemption for refusal of required tenant consent may end earlier, and certain new-landlord cases allow six months. A purchaser cannot inherit a seller’s registered exemption. Read the official exemption evidence requirements, then use the official PRS exemptions register.
4. If you are selling, check sale duties separately
A low rating does not itself prohibit a sale; certificate and marketing duties are separate. Certificates usually last ten years. For a listed home, ask the conservation officer about the conditional test on character or appearance. See GOV.UK guidance on EPCs when selling a home.
5. Planning for 2030
The January 2026 government decision sets a C-equivalent standard from 1 October 2030, with a planned £10,000 cap under new measures. Today, the E standard and the £3,500 cap still apply; the future figures are not current law, and a current E rating does not establish future compliance. Implementation depends on legislation. Read the January 2026 consultation outcome and the 4 November 2026 bill enforcement factsheet.
Rating guides
For what the letters mean, see EPC rating F and EPC rating G.
Sources
- GOV.UK: Domestic private rented property minimum energy efficiency standard — landlord guidance
- GOV.UK: PRS exemptions and exemptions register evidence requirements
- GOV.UK: Register a private rented sector energy standard exemption
- GOV.UK: Energy performance certificates when selling a home
- GOV.UK: Improving the energy performance of privately rented homes — 2025 update (January 2026 outcome)
- GOV.UK: Energy Independence Bill factsheet — domestic PRS minimum standards enforcement (4 November 2026)
Related guides
Compare published EPC figures
Aggregate context only; it does not check whether a letting complies.
Compare published EPC figures